Friday, Nov 16, 2018

Theology

Students Initiate Campus 3D Map Project

June 30, 2018

Students from Olivet School of Engineering and Architecture are collaborating with the University to compose a series of campus maps that are to be published upon completion.  The maps will serve as a visual guide for visitors to the campus, outlining Olivet’s landmarks, buildings, and academic facilities.  

The project arose from one of OSEA’s design labs as the group saw a need for a revamped map with updated information.  OSEA students have the opportunity to learn more about the University’s campus while researching style guides that can visually communicate its information.  

Reviewing blueprints and measuring the building structures will be an early step in the process before the team builds out 3D models.  Students will then followup the models with lighting, texture, and rendering out the final map.

Events / Calendar
  • Nov 22

    Thanksgiving Break (office closed)A Psalm of praise. Make a joyful noise unto the LORD, all ye lands. Serve the LORD with gladness: come before his presence with singing. Know ye that the LORD he is God: it is he that hath made us, and not we ourselves; we are his people, and the sheep of his pasture. Enter into his gates with thanksgiving, and into his courts with praise: be thankful unto him, and bless his name. For the LORD is good; his mercy is everlasting; and his truth endureth to all generations. (Psalm 100, KJV)

  • Dec 03

    Registration begins

  • Dec 07

    Last day of classes

  • Dec 10

    Final exam period

  • Dec 14

    Fall quarter ends